Water would be a continuous need until potable water was restored. With only one well working, he said the port’s water supply was at 30 percent. http://www.tribune242.com/news/2019/sep/11/we-will-rebuild-grand-bahama/
Water would be a continuous need until potable water was restored. With only one well working, he said the port’s water supply was at 30 percent. http://www.tribune242.com/news/2019/sep/11/we-will-rebuild-grand-bahama/